Port of Namibe (Moçâmedes)

Port of Namibe (Moçâmedes)

Port Technical Data

01 Structure
Two terminals: a central multipurpose / container terminal on the south side of Moçâmedes Bay, and the Sacomar mineral terminal (iron ore), ~10 km from the city.
02 Max draft (preupgrade)
Historically ~10.5 m at the commercial berths (piers ranging ~3–10.5 m); the Sacomar mineral/oil terminal historically ~19 m. The 2025 PDIBM dredging and quay extension changed these — confirm the current operating draft with the port
03 2025 upgrade (PDIBM)
Integrated Moçâmedes Bay development completed ~October 2025: dredging (reported 100% complete), container-terminal quay extension of ~288 m, new lifting equipment, VTS, tugs and pilot craft. Sacomar mineral terminal reopened December 2025.
04 Cargo types
Iron ore (via Sacomar), ornamental stone / granite, general and agricultural cargo, containers, cabotage, passengers.
05 Berths
Central terminal ~875 m of berth in three zones (largest ~480 m) plus the extended container quay; Sacomar dedicated mineral berth.
06 Anchorage
Moçâmedes Bay — naturally sheltered with minimal swell.
07 Tide & time restrictions
Sheltered bay, low swell. Confirm any berthspecific tidal or daylight working limits.
08 Pilotage
Compulsory; tug and pilot craft available (renewed under the 2025 works).
09 ISPS
ISPS-compliant. Pre-arrival documentation required.
10 Hinterland links
Moçâmedes railway line and EN-100 road; gateway for Huíla, Cunene and Cuando Cubango provinces.
11 Port authority
Porto do Namibe, E.P. (Complexo Portuário de Moçâmedes). Verify current contacts and VHF channels before quoting.

Frequently asked questions

Historically the commercial berths worked to around 10.5 m, with the Sacomar mineral terminal considerably deeper. The 2025 PDIBM dredging and quay extension have improved access, so the current operating draft should be confirmed with the port for your specific berth and vessel.

The Integrated Moçâmedes Bay Development Project (PDIBM) — completed around October 2025 — included dredging, a containerterminal quay extension of roughly 288 m, new cranes, a vessel traffic system, and renewed tug and pilot craft. The Sacomar mineral terminal reopened for iron-ore exports in December 2025.

Iron ore through the Sacomar terminal, ornamental stone and granite, general and agricultural cargo, containers and cabotage, plus passenger traffic — serving southern Angola's Huíla, Cunene and Cuando Cubango provinces.

Yes. The port connects to the Moçâmedes railway line and the EN-100 road, making it the main maritime gateway for the southern interior and for mineral exports.

Yes, pilotage is compulsory and tug assistance is available — the pilot and tug fleet was renewed under the 2025 works. Wadmar can arrange pilotage, towage and berth coordination for calls at Namibe.